Project

Warner Bros. Studios Post Production Facility

Project details

Structural Focus designed a new 51,000 SF, state-of-the-art, two-story building on the Burbank lot, the structure contains two large dubbing theaters, a new ADR stage, dozens of editing rooms, and many offices. The technical spaces had stringent acoustical requirements; the structural system was designed to assist in meeting those requirements. The larger dubbing and ADR stages are surrounded by a concrete masonry wall perimeter, and the editing rooms have floating concrete slabs to prevent the transfer of vibrations between the spaces.

Location
Burbank, CA
Project size
51,000 SF
Partner
HLW International
Awards
2006
Structural Engineers Association of Southern California (SEAOSC) – Excellence in Structural Engineering Award