Structural Focus provided structural engineering services for the adaptive reuse of an existing one-story warehouse building in Glendale. The project included numerous structural modifications encompassing new openings in the perimeter walls, new structures for editing rooms, studios, and a screening theater. Some seismic strengthening was required.

